Skip to main navigation Skip to search Skip to main content

Job Scheduling for a Multi-Line Steel Hot Rolling Mill With Selectable Furnaces

  • TU Wien, Automation & Control Institute (ACIN)

Research output: Chapter in Book or Conference Proceedings › Conference Proceedings with Oral Presentation › peer-review

Abstract

In a steel hot rolling mill, jobs are scheduled in groups for the production at two different production lines. The process of scheduling involves the selection and the sequencing of jobs as well as the assignment of selectable furnaces to some jobs. An optimal schedule minimizes unproductive times during the production while utilizing necessary retoolings of one production line as best as possible for the production at the other line. The resulting optimization problem is similar to a combination of several traveling salesman problems and orienteering problems.

A method is presented to accurately model the alternating production process on both lines, including sequence-dependent setup times, production line retoolings, and the use of an induction furnace with three chambers. Based on this model, unproductive times occurring in a given schedule can be calculated. These times are minimized by a tailored optimization algorithm, which consists of a simulated annealing metaheuristic followed by a local search. The effective application and benefit of this algorithm are demonstrated in a case study.
Original languageEnglish
Title of host publicationProceedings of the 22nd IFAC World Congress
Pages5376-5381
Volume56
Edition2
DOIs
Publication statusPublished - 22 Nov 2023
Event22nd IFAC World Congress - Yokohama, Japan
Duration: 9 Jul 2023 → 14 Jul 2023

Conference

Conference22nd IFAC World Congress
Country/TerritoryJapan
CityYokohama
Period9/07/23 → 14/07/23

Research Field

  • Complex Dynamical Systems

Keywords

  • Job scheduling
  • production planning
  • heuristic optimization
  • modeling of production processes
  • simulated annealing
  • local search
  • traveling salesman problem
  • orienteering problem

Fingerprint

Dive into the research topics of 'Job Scheduling for a Multi-Line Steel Hot Rolling Mill With Selectable Furnaces'. Together they form a unique fingerprint.

Cite this